Multiple Choice
The bill of material contains information necessary to
A) place an order to replenish the item
B) calculate quantities on hand and on order
C) convert net requirements into higher level gross requirements
D) convert gross requirements into net requirements
E) convert (explode) net requirements at one level into gross requirements at the next level
Correct Answer:

Verified
Correct Answer:
Verified
Q65: Which portion of the master production schedule
Q66: An engineering change notice is used to
Q67: By convention, the top level in a
Q69: Material requirements plans specify<br>A) the quantities of
Q71: Time fences divide that segment of the
Q72: By convention, the top level in a
Q73: A master production schedule contains information about<br>A)
Q74: In continuous (stock-to-forecast) operations, the master production
Q75: A very simple product (A) consists of
Q105: The supply-chain systems that result from using