Multiple Choice
Which of these patterns on a control chart would require a worker to stop the process and investigate for an assignable cause?
A) a run of five consecutive points below the center line
B) a run of three consecutive points all increasing
C) six consecutive points close to the center line
D) one point near the lower control limit
Correct Answer:

Verified
Correct Answer:
Verified
Q51: A coffee dispenser is supposed to dispense
Q52: If we are tracking quality of performance
Q53: A computer software manufacturer has a toll-free
Q54: Which of the following control charts is/are
Q55: Samaje studied his control chart and noticed
Q57: Defects in the finish of new, custom
Q58: Variations that usually occur in a process
Q59: Statistical process control uses regression and other
Q60: Table 15-1<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB5481/.jpg" alt="Table 15-1
Q61: The U.S.government awards for quality achievement are