Multiple Choice
Table 8-3
Each coffee table produced by Timothy Kent Designers nets the firm a profit of $9. Each bookcase yields a $12 profit. Kent's firm is small and its resources limited. During any given production period (of 1 week) , 10 gallons of varnish and 12 lengths of high quality redwood are available. Each coffee table requires approximately 1 gallon of varnish and 1 length of redwood. Each bookcase takes 1 gallon of varnish and 2 lengths of wood.
-Referring to Table 8-3, which of the following constraints would be used?
A) 10T + 12B ≤ 12
B) 1T + 1B ≤ 10
C) 1T + 2B ≥ 12
D) All of the above
E) None of the above
Correct Answer:

Verified
Correct Answer:
Verified
Q1: In production scheduling LP problems,inventory at the
Q7: The linear programming model of the production
Q10: Table 8-5<br>Ivana Myrocle wishes to invest her
Q12: Table 8-4<br>The following is a linear programming
Q14: Table 8-3<br>Each coffee table produced by Timothy
Q16: Table 8-3<br>Each coffee table produced by Timothy
Q18: Suppose that the problem described in Table
Q31: What is another name for blending problems?<br>A)diet
Q34: Swearingen and McDonald, a small furniture manufacturer,
Q82: Describe the portfolio selection linear programming application.