Multiple Choice
Use the case below to answer the following question(s) .
S&N Manufacturing makes four different steel sheets,A,B,C,and D,with different percentages of iron.Each sheet must flow through five departments,forming,rolling,sintering,painting,and quality check.The table below shows the relevant data.Production rates are shown in units/hour.(Sheet A uses imported steel and does not require rolling.)
S&N wants to determine the number of steel sheets to produce in order to maximize monthly profit.
Let A,B,C,and D denote the number of units of model A,B,C,and D to be produced,respectively.
-Which of the following is the inequality/equality that describes the time constraint of the rolling department?
A) B/15 + C/10 + D/10 ≥ 330
B) B/30 + C/20 + D/20 ≤ 330
C) B/45 + C/30 + D/30 = 330
D) B/60 + C/40 + D/40 = 330
Correct Answer:

Verified
Correct Answer:
Verified
Q75: Use the scenario given below to answer
Q76: Use the scenario given below to answer
Q77: Use the data given below to answer
Q78: Use the case below to answer the
Q79: In the constraints section obtained in solver
Q81: Use the case below to answer the
Q82: A nonbinding constraint is one for which
Q83: Use the case below to answer the
Q84: Briefly explain the difficulties experienced while using
Q85: What is a feasible solution?