Multiple Choice
Use the case below to answer the following question(s) .
S&N Manufacturing makes four different steel sheets,A,B,C,and D,with different percentages of iron.Each sheet must flow through five departments,forming,rolling,sintering,painting,and quality check.The table below shows the relevant data.Production rates are shown in units/hour.(Sheet A uses imported steel and does not require rolling.)
S&N wants to determine the number of steel sheets to produce in order to maximize monthly profit.
Let A,B,C,and D denote the number of units of model A,B,C,and D to be produced,respectively.
-Which of the following is the inequality/equality that describes the time constraint of the painting department?
A) A/30 + B/30 + C/35 + D/25 ≤ 330
B) B/30 + C/20 + D/20 = 330
C) A/70 + B/50 + C/50 + D/44 = 330
D) A/60 + B/60 + C/70 + D/50 ≤ 330
Correct Answer:

Verified
Correct Answer:
Verified
Q76: Use the scenario given below to answer
Q77: Use the data given below to answer
Q78: Use the case below to answer the
Q79: In the constraints section obtained in solver
Q80: Use the case below to answer the
Q82: A nonbinding constraint is one for which
Q83: Use the case below to answer the
Q84: Briefly explain the difficulties experienced while using
Q85: What is a feasible solution?
Q86: What are shadow prices? How are shadow