Multiple Choice
Ray's shipment of materials hit every red light and traffic jam on the way to the site.Upon arrival,half of the material was judged defective,necessitating a trip back to the supplier,and then the same arduous journey back to the site once the new materials were loaded.Traffic was a little better on the second round but the flat tire and subsequent repair caused as much if not more delay than the first trip.In the final analysis:
A) the project activity of Material Delivery was pretty close to the optimistic estimate.
B) the project activity of Material Delivery was pretty close to the most likely estimate.
C) the project activity of Material Delivery had a much higher variance than anticipated.
D) the project activity of Material Delivery was pretty close to the pessimistic estimate.
Correct Answer:

Verified
Correct Answer:
Verified
Q8: Activity Z has estimates a = 5,b
Q9: What is the early start time for
Q10: The amount of time that an activity
Q12: Project Test Bank is composed of activities
Q14: The term ordered activity means:<br>A)tasks must either
Q15: Use the network diagram and activity lengths
Q16: Based on the activity network pictured,what is
Q17: _ activities have two or more immediate
Q18: Activities C,D,and E in the project represented
Q80: Preceding activities are those that must occur