True/False
When a grounding connection must be made to the metal enclosure of a PLC system, any paint coating must be removed.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q29: The I/O module input and output status
Q30: PLCs are placed within an enclosure to
Q31: When a PLC is placed in the
Q32: If the scan time is too long,
Q33: The force instructions:<br>A)will force data table bits
Q35: A leakage problem can occur when connecting
Q36: The suppression circuit shown: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB6812/.jpg" alt="The
Q37: PLCs are generally placed within an enclosure.
Q38: PLC malfunctions due to electrical noise usually
Q39: The suppression device is normally wired in