Choose, among the following options, the inputs for Capacity requirements planning (CRP) .
1) Loading capacity
2) Rescheduling data from MPS
3) Routing data
4) Planned and released order from MRP systems
A) (1)
B) (2) and (3)
C) (1) , (3) and (4)
D) (4)
Correct Answer:

Verified
Correct Answer:
Verified
Q14: Capacity is the measure of productive capability
Q15: What is the planning horizon of the
Q16: Of the following capacity planning horizons, which
Q17: Dave is conducting Rough-Cut Capacity Planning (RCCP)for
Q18: Product gamma requires a sequence of
Q20: Using RCOF and the information in
Q21: Capacity Requirements Planning (CRP)is a Capacity planning
Q22: Product gamma requires a sequence of 5
Q23: Describe the activities and scope of Long-Range
Q24: Write the equation for Rated capacity.