Multiple Choice
There are 3 work stations (WC) with the following capacity: WC1 (2,000 units) , WC2 (2,500 units) , and WC3 (1,500 units) .While the load could be shifted from WC1 to WC2 and also in the opposite direction, WC3's load cannot be shifted to other WCs as a result of specialized equipment.In the following load situation, what is not a good solution?
WC1: 1500 units, WC2: 2250 units, WC3: 3100 units
A) Subcontracting
B) Increasing the efficiency of the operation
C) Pushing work back
D) Rerouting work to another work center
Correct Answer:

Verified
Correct Answer:
Verified
Q8: Capacity planning is the creation of a
Q9: AE Manufacturing has 60 machine hours every
Q10: AMT Transportations operates 2 shifts per day
Q11: Using RCOF and the information in
Q12: Material Requirements Planning (MRP)operates on a component
Q14: Capacity is the measure of productive capability
Q15: What is the planning horizon of the
Q16: Of the following capacity planning horizons, which
Q17: Dave is conducting Rough-Cut Capacity Planning (RCCP)for
Q18: Product gamma requires a sequence of