You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units per eight-hour day. Task times and precedence relationships are shown in the table below.
a. Draw the precedence diagram.
b. Determine the desired cycle time.
c. Determine the theoretical minimum number of stations needed.
d. Balance this line using most following tasks.
e. What is the efficiency of the line obtained in part d?
Correct Answer:

Verified
The precedence diagram appears...View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q7: "Having a focused work centre is like
Q9: An assembly line with 11 tasks is
Q22: Retail layouts thrive on the notion that<br>A)
Q31: Process-oriented layouts typically have low levels of
Q44: The _ is a non-numeric method for
Q76: _ are fees manufacturers pay to get
Q101: Daily capacity of a product layout is
Q115: A product requires 24 separate tasks, and
Q122: What are the two basic types of
Q129: What are the advantages and disadvantages of