Daily usage of an assembly is 100 in a facility that operates 300 days of the year. Setup cost is $5 and annualized carrying cost is $160. Production of this assembly occurs at the rate of 400 per day when production of the assembly is underway. Lead time is 3 days; safety stock is day's production. What is the optimum kanban size, and number of kanbans?