Multiple Choice
A method of input-output control that uses a system of cards to limit the amount of work at a work centre and also to control lead time and monitor backlog is
A) the assignment method.
B) backward scheduling.
C) forward scheduling.
D) constant work-in-process or ConWIP.
E) level material use.
Correct Answer: