Solved

A Brake System Installer in an Auto Factory Has an Actual

Question 29

Essay

A brake system installer in an auto factory has an actual average time of 12.5 minutes on her task. The performance rating of the worker timed was estimated at 108%. Practice in this department is to allow 17% for the constant allowances. There is currently no variable allowance.
a. Find the normal time for the operation.
b. Compute the standard time for the operation.
c. Recompute the standard time if a variable allowance of 21% is factored in.

Correct Answer:

verifed

Verified

a. Normal time = 12.5 minutes ...

View Answer

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions