Multiple Choice
Four products (1,2,3,and 4) must be processed on one of four machines (A,B,C,and D) .The times required in minutes for each product on each machine are shown below: If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 1 is assigned to
A) machine A
B) machine B
C) machine C
D) machine D
Correct Answer:

Verified
Correct Answer:
Verified