Multiple Choice
Table 9.21
Table 7.21 The following information is given about an assembly line.
The desired output rate is 90 units per hour.
-A line balancing solution has been developed for the assembly line for fertilizer spreaders at Green Grass,Inc.The desired output rate of 30 spreaders per hour will be achieved.The sum of times for all tasks performed on the line is 1200 seconds for each spreader assembled.This is the total productive time.Which of the following statements must be TRUE?
A) The cycle time is 30 seconds per spreader.
B) The "theoretical minimum" number of stations is 10.
C) If solution calls for 12 stations, the efficiency is 80%.
D) If the solution calls for 11 stations, the efficiency is 80%.
Correct Answer:

Verified
Correct Answer:
Verified
Q55: Fun Vehicles, Inc. makes beach buggies on
Q56: _ is a key factor in
Q92: The rectilinear distance between points A (15,
Q177: This clustering of non- competing firms can
Q200: Kiddie Clothes wishes to locate its
Q201: Balance the assembly line using the
Q204: Table 9.6<br>Nuts-and-Bolts Inc. wishes to find
Q205: Table 9.2<br>Durham Toy, Inc. has five
Q206: Table 9.2<br>Durham Toy, Inc. has five
Q207: The load-distance method is a qualitative model