Where the owner is sufficiently familiar and confident of the financial and contractual capabilities of the GCs bidding for the project, the owner may not require the bid bond. This reduces the total cost of construction.
Correct Answer:

Verified
Correct Answer:
Verified
Q32: The bidding documents include<br>A)construction drawings, specifications, addenda,
Q33: Who is typically responsible for obtaining the
Q34: In MasterFormat, roofing is part of<br>A)Division 10.<br>B)Division
Q35: MasterFormat has been developed by the<br>A)Associated General
Q36: Section 1.6 of the text states that
Q38: A contract document set consists of<br>A)construction drawings,
Q39: Explain what is included in record documents
Q40: When does the owner receive manufacturers' warranties
Q41: List the phases into which the work
Q42: In MasterFormat, Division 04 refers to<br>A)General Requirements.<br>B)Metals.<br>C)Existing