Multiple Choice
Who is typically responsible for obtaining the certificate of occupancy from the local jurisdiction?
A) Owner
B) GC
C) Architect
Correct Answer:

Verified
Correct Answer:
Verified
Q28: The construction drawings for a building project
Q29: All required surety bonds must be provided
Q30: Sketch in three dimensions the hypothetical building
Q31: In MasterFormat, windows are part of<br>A)Division 06.<br>B)Division
Q32: The bidding documents include<br>A)construction drawings, specifications, addenda,
Q34: In MasterFormat, roofing is part of<br>A)Division 10.<br>B)Division
Q35: MasterFormat has been developed by the<br>A)Associated General
Q36: Section 1.6 of the text states that
Q37: Where the owner is sufficiently familiar and
Q38: A contract document set consists of<br>A)construction drawings,