Multiple Choice
The shop drawings are prepared by the
A) structural engineer.
B) architect.
C) MEP engineer.
D) all of the above.
E) none of the above.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q67: In a typical building project, the GC
Q68: The design phase of a project is
Q69: The term MEP is an acronym for<br>A)mechanical,
Q70: The owner is required to provide payment
Q71: What is contained in the program of
Q73: Explain the purposes of the three surety
Q74: The construction drawings of a building project
Q75: List the important items contained in a
Q76: In MasterFormat, Division 02 refers to<br>A)Procurement and
Q77: Shop drawings are prepared during the design