Multiple Choice
The construction drawings of a building project are prepared during the
A) DD stage of the project.
B) CD stage of the project.
C) preconstruction phase of the project.
D) SD stage of the project.
E) construction phase of the project.
Correct Answer:

Verified
Correct Answer:
Verified
Q69: The term MEP is an acronym for<br>A)mechanical,
Q70: The owner is required to provide payment
Q71: What is contained in the program of
Q72: The shop drawings are prepared by the<br>A)structural
Q73: Explain the purposes of the three surety
Q75: List the important items contained in a
Q76: In MasterFormat, Division 02 refers to<br>A)Procurement and
Q77: Shop drawings are prepared during the design
Q78: The project delivery method that should ensure
Q79: The primary purpose of the contract modification