Multiple Choice
Which of the following lists indicates the correct ordering of deliverables in a system specification document?
A) System Acquisition Weighted Alternative Matrix,Interface Design,Physical Data Model Data Storage Design
B) Data Storage Design,Interface Design,Architecture Design,Updated Crud Matrix
C) Hardware and Software Specifications,Interface Design,Data Storage Design,Architecture Design
D) Program Design Specifications,Physical Data Model,Data Storage Design,Architecture Design
E) Update CASE Repository Entries,Update CRUD Matrix,Interface Design,Architecture Design
Correct Answer:

Verified
Correct Answer:
Verified
Q52: If on a limited time budget,the best
Q53: In the initial stage of design,what are
Q54: CRUD stands for Create,Redesign,Update and Deploy -
Q55: During the initial part of design,the project
Q56: Prototyping is the interface design step that
Q58: If the expertise needed to build a
Q59: The following document is utilized with possible
Q60: Backlogs and backlog creation are a CON
Q61: During the design phase,the project team carefully
Q62: A department head is apprehensive as to