Multiple Choice
The following document is utilized with possible vendors on projects with smaller budgets,instead of sending a lengthy document to all possible vendors:
A) Request for Proposal (RFP)
B) Request for Information (RFI)
C) Request for Quote (RFQ)
D) Request for Efficient Information Distribution (REID)
E) More Optimal Desires (MOD)
Correct Answer:

Verified
Correct Answer:
Verified
Q54: CRUD stands for Create,Redesign,Update and Deploy -
Q55: During the initial part of design,the project
Q56: Prototyping is the interface design step that
Q57: Which of the following lists indicates the
Q58: If the expertise needed to build a
Q60: Backlogs and backlog creation are a CON
Q61: During the design phase,the project team carefully
Q62: A department head is apprehensive as to
Q63: Custom development that can be achieved by
Q64: System design is the determination of the