Solved

A Nevada Bank Keeps Track of Errors from 20 Clerks

Question 34

Essay

A Nevada Bank keeps track of errors from 20 clerks.Each sample has 100 records.They want to construct a P-chart to track the proportion of errors in each sample.The table below shows the number of errors per sample.(Use z=3 for control limit calculations.)
A Nevada Bank keeps track of errors from 20 clerks.Each sample has 100 records.They want to construct a P-chart to track the proportion of errors in each sample.The table below shows the number of errors per sample.(Use z=3 for control limit calculations.)     a.Determine P. b.Determine σP. c.Determine the 3-sigma UCL and LCL. d.Does the process appear to be in statistical control?
a.Determine P.
b.Determine σP.
c.Determine the 3-sigma UCL and LCL.
d.Does the process appear to be in statistical control?

Correct Answer:

verifed

Verified

a. 88/2000=0.044 or 4.4%
b.
\[
\sigma_{0 ...

View Answer

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions