Multiple Choice
Everett, Inc. budgeted $1,488,000 for total overhead. The standard variable overhead rate was $2 per direct labour hour, or $6 per unit, based on an anticipated activity level of 600,000 direct labour hours. During the year 220,000 units were produced. Fixed overhead costs incurred were $300,000. The variable overhead budget variance was $19,800 unfavourable, and the actual variable overhead rate was $2.10 per direct labour hour.
The variable overhead efficiency variance was:
A) $76,000 U
B) $63,800 U
C) $46,200 F
D) $44,000 F
Correct Answer:

Verified
Correct Answer:
Verified
Q94: Standard costs are used to:<br>A) Allocate support
Q95: Which of the following is a possible
Q96: Calculating variances is a necessary, but not
Q97: Pardee, Inc. completed operations for the
Q98: Dem Mfg. has gathered the following
Q100: Expected costs per unit of input are
Q101: Hyteck, Inc. is a capital intensive
Q102: Mason, Inc. uses a standard costing system.
Q103: Which of the following statements regarding tradeoffs
Q104: Variances can be caused by:<br>I. Out-of-control operations<br>II.