Planning the flow of work requires production activity control to: I. Be sure the material needed is available.
II) Be sure the tooling needed is available.
III) Schedule the start and stop dates at each work center.
IV) Advise the plant supervisor of future orders.
A) all of the above
B) I, II and III
C) I, II and IV
D) II, III and IV
E) I, III and IV
Correct Answer:

Verified
Correct Answer:
Verified
Q24: Given the following information, which sequence
Q25: Which file contains information on the efficiency
Q26: Operation overlapping means:<br>A) using alternate routings<br>B) moving
Q27: If today is manufacturing day 100 and
Q28: The selection and sequencing of available jobs
Q30: The activities of production activity control can
Q31: Which of the following is NOT a
Q32: Which of the following statements is true?<br>I.
Q33: Work authorization can be classified under the
Q34: Operation splitting means:<br>A) the same job running