Multiple Choice
SCENARIO 15-4
A factory supervisor is concerned that the time it takes workers to complete an important production task (measured in seconds) is too erratic and adversely affects expected profits.The supervisor proceeds by randomly sampling 5 individuals per hour for a period of 10 hours.The sample mean and range for each hour are listed below.
She also decides that lower and upper specification limit for the critical-to-quality variable should be
10 and 30 seconds, respectively.
-Referring to SCENARIO 15-4, suppose the supervisor constructs an X chart to see if the process is in-control.What is the center line of the chart?
A) 20.00
B) 20.26
C) 21.00
D) 24.26
Correct Answer:

Verified
Correct Answer:
Verified
Q17: Quick Changeover Techniques involve methods that enable
Q23: In multidimensional scaling,the stress statistic is used
Q38: Some business analytics involve starting with many
Q45: Neural networks use the validating data to
Q49: Splitting is always followed by pruning in
Q70: The focus of Lean Six Sigma is
Q167: The prescriptive analytics technique in which the
Q168: SCENARIO 15-4<br>A factory supervisor is concerned
Q170: SCENARIO 15-8<br>Recently, a university switched to
Q174: SCENARIO 15-9<br>The manufacturer of canned food