SCENARIO 15-4
A factory supervisor is concerned that the time it takes workers to complete an important production task (measured in seconds) is too erratic and adversely affects expected profits.The supervisor proceeds by randomly sampling 5 individuals per hour for a period of 10 hours.The sample mean and range for each hour are listed below.
She also decides that lower and upper specification limit for the critical-to-quality variable should be
10 and 30 seconds, respectively.
-Referring to SCENARIO 15-4, suppose the supervisor constructs an X chart to see if the process is in-control.What are the lower and upper control limits of this chart?
A) 10.00, 30.00
B) 8.49, 32.03
C) 5.39, 35.13
D) 4.96, 35.56
Correct Answer:

Verified
Correct Answer:
Verified
Q20: The SS method involves methods that enable
Q38: Some business analytics involve starting with many
Q49: Splitting is always followed by pruning in
Q70: The focus of Lean Six Sigma is
Q163: SCENARIO 15-4<br>A factory supervisor is concerned
Q164: Which of the following is a method
Q166: Successful implementation of a classification tree requires
Q167: The prescriptive analytics technique in which the
Q170: SCENARIO 15-8<br>Recently, a university switched to
Q172: SCENARIO 15-4<br>A factory supervisor is concerned