Multiple Choice
Upper UCL) and lower control limits LCL) :
A) are set by design engineers to a specific product specification.
B) are dependent on a specific process.
C) set by a machine operator based on the daily production requirements.
D) require operator action when the process is outside normal operating range.
E) are a critical factor in the success of a TQM program.
Correct Answer:

Verified
Correct Answer:
Verified
Q5: A six sigma 6σ) approach to quality:<br>A)
Q6: Statistical process control SPC) is a technique
Q7: External failure costs are incurred when poor-quality
Q8: Deming's 14 points stress the importance of:<br>A)
Q9: A supplier certification program:<br>A) adds cost to
Q11: It is unreasonable to expect a supplier
Q12: Determination of the "best buy" is based
Q13: A process is capable when:<br>A) the supplier
Q14: A sampling technique that is based on
Q15: Total quality management TQM) is a philosophy