Multiple Choice
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models. The manufacturing process consists of two departments: fabrication and finishing. The fabrication department has 8 skilled workers, each of whom works
9.25 hours per day. The finishing department has 5 workers, each of whom works a 6-hour shift per day. Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing. The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing. The company operates 6 days a week. It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model. The company anticipates selling at least twice as many Lava models as Graystone models.
Use the spreadsheet below for Stone Age Surfboards to answer the following questions) using integer constraints on variables in the optimization models using the standard Solver.
-What is the quantity of Lava surfboards produced?
A) 2
B) 5
C) 7
D) 10
Correct Answer:

Verified
Correct Answer:
Verified
Q41: Use the table below to answer
Q42: Stone Age Surfboards is a small manufacturer
Q43: Use the table below to create
Q44: Rectilinear distance is the measure of distance
Q45: Decision variables that are forced to be
Q47: Use the table below to answer
Q48: Stone Age Surfboards is a small manufacturer
Q49: Explain the method of Integer Linear Optimization
Q50: Stone Age Surfboards is a small manufacturer
Q51: Use the table below to answer