Kick Scooters
Metal frames for kick scooters are manufactured in two steps: Stamping and assembly. Each frame is made up of three pieces: one unit of part A and two units of part B.
The parts are fabricated by a single stamping machine that requires a set up time of 90 minutes switching between two part types. Once the machine is set up, the activity time for parts, regardless of type, is 30 seconds each piece. Currently, the stamping machine rotates its production between one batch of 120 part A's and 240 part B's. Completed parts move only when the entire batch is produced.
At assembly, parts are assembled manually to form the finished products. The three parts and a number of small purchased components are required for each unit of final product. Each product requires 30 minutes of labor time to assemble. There are 12 workers in assembly. There is sufficient demand to sell every scooter the system can make
-One way to increase process capacity is to
A) increase the batch size at the Stamping step
B) decrease the batch size at the Stamping step
C) add more workers at Assembly
D) none of the above
Correct Answer:

Verified
Correct Answer:
Verified
Q19: Toyota and Capital One Cases<br>-In the Toyota
Q20: ProofSmart Inc.<br>ProofSmart Inc., a supplier of
Q21: Kick Scooters<br>Metal frames for kick scooters are
Q22: Airport Massage Station<br>A small company just opened
Q23: Old City Photographics<br> Located alongside a
Q24: The right to vote (and not
Q25: Old City Photographics<br> Located alongside a
Q26: Airport Massage Station<br>A small company just opened
Q27: Penne Pesto<br>Penne Pesto is a small restaurant
Q28: Toyota and Capital One Cases<br>-Which of the