Multiple Choice
Solve the problem.
-A construction crane lifts a 100-lb bucket originally containing 130 lb of sand at a constant rate. The sand leaks out at a constant rate so that there is only 65 lb of sand left when the crane reaches a height of 60 feet. How
Much work is done by the crane?
A) 13,800 ft · lb
B) 5850 ft · lb
C) 2550 ft · lb
D) 11,850 ft · lb
Correct Answer:

Verified
Correct Answer:
Verified
Q6: Find the volume of the solid
Q7: Find the volume of the solid
Q8: Use the shell method to find
Q9: Find the volume of the solid
Q10: Solve the problem.<br>-A water tank is
Q12: Set up an integral for the
Q13: Solve the problem.<br>-Find a curve through
Q14: Find the volume of the solid
Q15: Find the volume of the solid
Q16: Provide an appropriate response.<br>-The region shown