Consider a work center with a demand rate of 35 parts per hour and using a container that can hold 10 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 20 percent. What is the value of C for this system?
A) 35
B) 10
C) 1
D) 0.2
Correct Answer: