Multiple Choice
Consider a work center with a demand rate of 20 parts per hour and using a container that can hold 5 parts. It is estimated that the container takes 30 minutes to cycle through the work cell. Assume a safety stock level of 10 percent. What is the (rounded) value of K for this system?
A) 1
B) 2
C) 3
D) Cannot be determined from the information given
Correct Answer:

Verified
Correct Answer:
Verified
Q33: There are typically _ wastes associated with
Q34: Lean production tends to?<br>A) Rely on less
Q35: Shigeo Shingo developed what concept that refers
Q36: After the 2011 earthquake and tsunami in
Q37: Consider a work center with a demand
Q39: How have lean concepts evolved in recent
Q40: The Japanese term Seiketsu is associated with
Q41: Adopting lean practices can?<br>A) Result in reduced
Q42: A _ is used to signal the
Q43: Technological changes have _.<br>A) Made lean systems