Solved

Work: a Crane Lifts a 425 Kg Steel Beam Vertically

Question 31

Multiple Choice

Work: A crane lifts a 425 kg steel beam vertically a distance of Work: A crane lifts a 425 kg steel beam vertically a distance of   How much work does the crane do on the beam if the beam accelerates upward at 1.8 m/s<sup>2</sup>? Neglect frictional forces. A)  5.8 × 10<sup>5</sup> J B)  3.4 × 10<sup>5 </sup>J C)  4.0 × 10<sup>5</sup> J D)  4.9 × 10<sup>5 J</sup> How much work does the crane do on the beam if the beam accelerates upward at 1.8 m/s2? Neglect frictional forces.


A) 5.8 × 105 J
B) 3.4 × 105 J
C) 4.0 × 105 J
D) 4.9 × 105 J

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions