Multiple Choice
Use the process flow diagram to determine which of these events has the greatest net benefit.
A) reducing the flow time at Station A from 10 to 8 minutes
B) increasing the capacity at Station B to 12 units per hour
C) increasing the capacity at Station C to 10 units per hour
D) reducing the flow time at Station D from 12 to 10 minutes
Correct Answer:

Verified
Correct Answer:
Verified
Q44: _ is the total time taken from
Q45: Figure 5.1<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Figure 5.1
Q46: What is contribution margin for a product?
Q47: Instead of producing products with the highest
Q48: Instead of dividing the total standard time
Q50: _ is the maximum time allowed for
Q51: The fourth step in Theory of Constraints
Q52: A mixed-model line produces several items belonging
Q53: Table 5.2<br>A company makes four products that
Q54: Table 5.5<br>Balance the following line for an