Multiple Choice
Figure 5.1
The figure above shows the process for paying tuition at a major university. Students receive their bill, for the next term, for review. They are directed to different tables for clarifications, before being asked to pay their tuition at E. The numbers in parentheses are the time in minutes for each step of the process.
-Use the information in Figure 5.1. What is the capacity for the A-B-C-E process route?
A) 10 students per hour
B) 6 student per hour
C) 3.5 students per hour
D) 2.9 students per hour
Correct Answer:

Verified
Correct Answer:
Verified
Q57: Table 5.3<br>King Supply makes four different types
Q58: Table 5.1<br>A company makes four products that
Q59: In a drum-buffer-rope system, the lot size
Q60: Table 5.6<br>Balance the following line for an
Q61: Constraints at any step causes imbalance in
Q63: Any system composed of resources that are
Q64: Table 5.7<br>The Terminal Company is attempting to
Q65: _ is the maximum rate of output
Q66: A bottleneck is an operation that has
Q67: Managers should produce products with the highest