Multiple Choice
Table 5.1
A company makes four products that have the following characteristics: Product A sells for $50 but needs $10 of materials and $15 of labor to produce; Product B sells for $75 but needs $30 of materials and $15 of labor to produce; Product C sells for $100 but needs $50 of materials and $30 of labor to produce; Product D sells for $150 but needs $75 of materials and $40 of labor to produce. The processing requirements for each product on each of the four machines are shown in the table.
Work centers W, X, Y, and Z are available for 40 hours per week and have no setup time when switching between products. Market demand for each product is 80 units per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.
-Use the information in Table 5.1. Using the traditional method, in what sequence should products be scheduled for production?
A) D, C, B, A
B) D, B, A, C
C) C, D, A, B
D) C, D, B, A
Correct Answer:

Verified
Correct Answer:
Verified
Q53: Table 5.2<br>A company makes four products that
Q54: Table 5.5<br>Balance the following line for an
Q55: Fun Vehicles, Inc. makes beach buggies on
Q56: Variability of a firm's workload may create
Q57: Table 5.3<br>King Supply makes four different types
Q59: In a drum-buffer-rope system, the lot size
Q60: Table 5.6<br>Balance the following line for an
Q61: Constraints at any step causes imbalance in
Q62: Figure 5.1<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Figure 5.1
Q63: Any system composed of resources that are