Multiple Choice
Table 5.1
A company makes four products that have the following characteristics: Product A sells for $50 but needs $10 of materials and $15 of labor to produce; Product B sells for $75 but needs $30 of materials and $15 of labor to produce; Product C sells for $100 but needs $50 of materials and $30 of labor to produce; Product D sells for $150 but needs $75 of materials and $40 of labor to produce. The processing requirements for each product on each of the four machines are shown in the table.
Work centers W, X, Y, and Z are available for 40 hours per week and have no setup time when switching between products. Market demand for each product is 80 units per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.
-Use the information in Table 5.1. Using the traditional method, what is the optimal product mix (consider variable costs only-overhead is not included in this profit calculation) ?
A) 71 A, 80B, 80C, 80 D
B) 80A, 72B, 80C, 80D
C) 80A, 80B, 60C, 80D
D) 80A, 80B, 80C, 70D
Correct Answer:

Verified
Correct Answer:
Verified
Q95: The traditional method of determining contribution margin
Q96: Table 5.1<br>A company makes four products that
Q97: Table 5.6<br>Balance the following line for an
Q98: Work should be released into the system
Q99: Balance delay could be described as the:<br>A)
Q101: Figure 5.4<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Figure 5.4
Q102: Figure 5.3<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Figure 5.3
Q103: Balance the line in order to achieve
Q104: Which statement about transfer batch sizes is
Q105: Table 5.2<br>A company makes four products that