Table 5.1
A company makes four products that have the following characteristics: Product A sells for $50 but needs $10 of materials and $15 of labor to produce; Product B sells for $75 but needs $30 of materials and $15 of labor to produce; Product C sells for $100 but needs $50 of materials and $30 of labor to produce; Product D sells for $150 but needs $75 of materials and $40 of labor to produce. The processing requirements for each product on each of the four machines are shown in the table.
Work centers W, X, Y, and Z are available for 40 hours per week and have no setup time when switching between products. Market demand for each product is 80 units per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.
-Use the information in Table 5.1. Which work center is of greatest concern to the operations manager?
A) Work Center W
B) Work Center X
C) Work Center Y
D) Work Center Z
Correct Answer:

Verified
Correct Answer:
Verified
Q91: Consider the following production process. It is
Q92: A line balance that is 100% efficient
Q93: Table 5.3<br>King Supply makes four different types
Q94: Figure 5.4<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Figure 5.4
Q95: The traditional method of determining contribution margin
Q97: Table 5.6<br>Balance the following line for an
Q98: Work should be released into the system
Q99: Balance delay could be described as the:<br>A)
Q100: Table 5.1<br>A company makes four products that
Q101: Figure 5.4<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Figure 5.4