Short Answer
An operator standing idly by his workstation because a previous process with quality issues was delayed is an example of ________.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q39: Long production runs, poor material flows, and
Q40: Case 6.1<br>The Edward James Toy Company uses
Q41: Lean systems do not need stable master
Q42: Value stream maps consist of a(n)_, a(n)_,
Q43: The final assembly schedule in a lean
Q45: Weeding out unnecessary items, neatly arranging what's
Q46: A _ is a workstation in which
Q47: Jones Electric Motors uses a Kanban system
Q48: Firms that have highly repetitive processes and
Q49: Happiness, Inc. uses a Kanban system. The