Essay
A task involves positioning two metal parts with a rubber gasket sandwiched between them, inserting two bolts into predrilled holes, threading a nut onto each bolt, and tightening each bolt with a pneumatic wrench. In a preliminary study, the manager observed one of his workers performing this task five times. The observations were made in an air-conditioned, well-lit training facility, at ground level, with all tools and equipment clean and readily available.
(a) What is the average observed time for this task?
(b) What is the normal time for this task if the employee worked at a 10% slower pace than is typical for adequately trained workers?
(c) What is standard time for this task if allowances sum to 14%?
Correct Answer:

Verified
(a) Actual observed time is 28...View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q136: What is quality of work life? What
Q137: Brandon's computer shop sells most of its
Q138: Which of the following is one of
Q139: One drawback of a product-oriented layout is
Q140: The purpose of labor standards is to
Q142: _ involves enlarging employee jobs so that
Q143: A work cell is scheduled to build
Q144: _ are charges that manufacturers pay to
Q145: Explain what the purpose of assembly-line balancing
Q146: Psychological factors have little relevance in the