Multiple Choice
A bread-making factory has the production process shown in the figure below. There are five operations in sequence. The product only needs to go through one of the parallel machines in each case where parallel machines exist. Assume 8 hours per day, 7 days per week, what is the weekly capacity of the process?
A) 96 batches
B) 112 batches
C) 67 batches
D) 56 batches
E) 84 batches
Correct Answer:

Verified
Correct Answer:
Verified