Multiple Choice
In a stopwatch time study, the average of the times recorded for a given worker to perform a given task is the:
A) observed time.
B) normal time.
C) standard time.
D) allowance time.
E) performance rating time.
Correct Answer:

Verified
Correct Answer:
Verified
Q89: Which sample proportion will require the largest
Q90: Work sampling is most frequently used to
Q91: A worker-machine chart can be used to
Q92: Asking a group of employees at a
Q93: In motion studies, a therblig is a:<br>A)charting
Q95: Process chart symbols do not include:<br>A)delay.<br>B)inspection.<br>C)operation.<br>D)rejection.<br>E)storage.
Q96: A methods and measurement analyst wants to
Q97: From the worker's perspective, an output-based pay
Q98: Which is not a requirement for an
Q99: A methods and measurements analyst needs to