There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows:
There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows:   After the row and column reductions, what is the minimum number of lines needed to cover all of the zeroes? A) 0 lines B) 1 line C) 2 lines D) 3 lines E) 4 lines
After the row and column reductions, what is the minimum number of lines needed to cover all of the zeroes?


A) 0 lines
B) 1 line
C) 2 lines
D) 3 lines
E) 4 lines