Multiple Choice
Job X arrived at work center Q at noon. At 2 p.m. that same day X was begun. X left work center Q at 3:15 p.m. that same day. X's flow time, in minutes, was
A) 195.
B) 120.
C) 75.
D) 60.
E) Cannot be determined.