Multiple Choice
Which of the following is not a step in the control process?
A) Define what is to be controlled.
B) Compare measurements to a standard.
C) 100 percent inspection.
D) Take corrective action if necessary.
E) Evaluate corrective action.
Correct Answer:

Verified
Correct Answer:
Verified
Q60: The assurance that processes are performing in
Q61: A design engineer wants to construct a
Q62: A c-chart is used to monitor the
Q63: A shift in the process mean for
Q64: The process capability index (C<sub>pk</sub>)may mislead if<br>(I)the
Q66: The following data occurs chronologically from left
Q67: The approaches to quality assurance are<br>A)process inspection,
Q68: Process capability compares process variability to the
Q69: A design engineer wants to construct a
Q70: The probability of concluding that assignable variation