The chair of the operations management department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are in control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results
What are the .95 (5 percent risk of Type I error) upper and lower control limits for the p-chart?
A) .95 and .05
B) .13 and .07
C) .1588 and .0412
D) .16 and .04
E) .1774 and .0226
Correct Answer:

Verified
Correct Answer:
Verified
Q67: The approaches to quality assurance are<br>A)process inspection,
Q68: Process capability compares process variability to the
Q69: A design engineer wants to construct a
Q70: The probability of concluding that assignable variation
Q71: Larger samples will require wider x-bar control
Q73: A p-chart would be used to monitor<br>A)average
Q74: The variation of a sampling distribution isless
Q75: The sampling distribution can be assumed to
Q76: A point which is outside of the
Q77: The basis for a statistical process control