Multiple Choice
Following are some of the recognized risks which cannot be managed by inspection alone except one
A) Equipment nearing retirement
B) Failure mechanisms (such as brittle fracture, fatigue) where avoidance of failure primarily depends on operating within a defined pressure/temperature envelope
C) Consequence-dominated risks
D) The suitability and current condition of the equipment within the current operating envelope will determine the probability of failure (POF) of the equipment from one or more deterioration mechanisms
Correct Answer:

Verified
Correct Answer:
Verified
Q66: The following are the risks identified by
Q67: The reduction in the ability of a
Q68: Potential source of errors in RBI analysis
Q69: The event may be<br>A) Singular or multiple<br>B)
Q70: Probability of failure analysis is made from<br>A)
Q72: For qualitative RBI analysis it is important
Q73: Following are not the residual risk factors
Q74: The models are evaluated _ to provide
Q75: If the probability and consequence combination (risk)
Q76: Failure mode can primarily affects the<br>A) Magnitude<br>B)