Multiple Choice
You are the Test Manager of a project that adopts a V-model with four formal levels of testing: unit, integration, system and acceptance testing. On this project reviews have been conducted for each development phase prior to testing, which is to say that reviews of requirements, functional specification, high-level design, low-level design and code have been performed prior to testing. Assume that no requirements defects have been reported after the release of the product. Which TWO of the following metrics do you need in order to evaluate the requirements reviews in terms of phase containment effectiveness? Number of correct responses: 2
A) Number of defects found during the requirements review
B) Total number of defects attributable to requirements found during unit, integration, system and acceptance testing
C) Total number of defects found during functional specification review, high-level design review, low-level design review, code review, unit testing, integration testing, system testing and acceptance testing
D) Time to conduct the requirements review
E) Total number of defects attributable to requirements, found during functional specification review, high-level design review, low-level design review, code review, unit testing, integration testing, system testing and acceptance testing
Correct Answer:

Verified
Correct Answer:
Verified
Q1: The main objectives the senior management team
Q2: Assume you are the Test Manager for
Q3: The following chart plots the cumulative number
Q5: Consider the following test strategies:<br>A) Consultative test
Q6: Assume you are managing the system testing
Q7: Which of the following statements describing the
Q8: After a selection process you have selected
Q9: Which of the following statements best describes
Q10: You are following a risk-based testing strategy.
Q11: Which of the following is an example