Services
Discover
Ask a Question
Log in
Sign up
Filters
Done
Question type:
Essay
Multiple Choice
Short Answer
True False
Matching
Topic
Certification
Study Set
Huawei
Exam 11: HCIE-Storage
Path 4
Access For Free
Share
All types
Filters
Study Flashcards
Practice Exam
Learn
Question 281
Multiple Choice
HP UN order lvextend-m parameters can be set behind. What is the value? (Multiple choice.)
Question 282
Multiple Choice
Engineer installed a customer unit for OceanStor 9000 equipment installation (a total of 5 OceanStor 9000 C Node, front and rear ends are 10GE TOE networking, on-site installation TOE network card) . Then connected the signal lines, power lines, and debugged the software. In the period of project tension, the hardware installation process has some of the following phenomena. Which of the following description of these phenomena is correct? (Multiple choice.)
Question 283
Multiple Choice
Which of the following statements replacing the storage array controller is wrong?
Question 284
Multiple Choice
A TV station plans to adopt Huawei OceanStor 9000 as a back-end storage system, with 10 OceanStor 9000 C nodes, planned to be deployed in 4 standard cabinets, with all backends connected to a pair of stacked back-end CE6850 switches. There is no single customer in the existing networking standalone management network. Which of the network IP address planning described below is incorrect?
Question 285
Multiple Choice
Which of the following statements about Huawei OceanStor V3 series storage array synchronous remote replication and asynchronous remote replication is incorrect? (Multiple choice)
Question 286
Multiple Choice
Which of the following is not an authentication method supported by the OceanStor 9000 NFS protocol?
Question 287
True/False
during the disaster recovery drill, to you want to switch the service to the disaster recovery end. In order to prove the reliability of the disaster recovery system, you need to test by simulation test and other means as much as possible.