Multiple Choice
What is an "escaped defect"?
A) A defect that was found by the customer.
B) A defect that was planned to be fixed, but not fixed in a Sprint.
C) A defect the Continuous Integration System failed to catch.
Correct Answer:

Verified
Correct Answer:
Verified